Company
Deles group
Deles Academy
One source
One source model
Packaging solutions
Integrated logistics
End-of-line automation
Sustainability
Case history
Magazine
Info
Contacts
Work with us
Privacy Policy
EN
IT
DE
PL
1.
Need
Optimize the management and entry of materials into the plant
Flow optimization in general
Search for new solutions
2.
Process implemented
Switching from pre-assembled materials to self-assembling packaging kits delivered flat
Buffer stock warehouse within the company where Deles manages the materials
Switching from a "call off" supply to a demand planning based on production schedules (daily)
Consignment stock invoiced at the time of withdrawal
3.
Value generated
Single partner:
Reduction of warehouse costs
Reduction in the number of daily deliveries (from 16 trucks to 2 full loads)
Reduction of transport costs and reduction of CO2 emissions
-15% of transport / day
ARE YOU INTERESTED?
Contact us for ONE SOURCE: a tailor-made solution
info@delesgroup.com
I declare that I have read and accepted the
privacy policy
Close
Zoom
Context Menu is disabled by theme settings.